This page provides the ability to manage trade documents for a project.
Users may get to this page by. Clicking on the Project Trade Documents
link in the left navigation area under the Project Mgmt section. Clicking
on the Project Trade Documents link in the Project Components section
of the Project Detail page for the selected project.
On the Projects page, click a Project
Name link. The Project Detail for that project opens, and the Project
Mgmt links appear on the Left Nav Bar.
Click the Trade Documents
link on the Left Nav Bar under Project
Mgmt. The Project Trade Documents page opens for the chosen project.
To include trade documents in the list of project trade
documents, click the Include check
box next to each trade document you want to include that is under the
Excluded Trade Documents section.
Click the Include All
button at the top of the page to immediately move all Excluded Trade Documents
into the Included Trade Documents. There is no way to automatically undo
this action.
To exclude trade documents, click the Exclude
check box next to each trade document you want to exclude that is under
the Included Trade Documents section.
Click the Exclude All
button at the top of the page to immediately move all Included Trade Documents
into the Excluded Trade Documents. There is no way to automatically undo
this action.
Click the Update
button in the top right of the page.
To mark the Project Trade Documents section as Complete,
click the Complete? check box
in the top right of the page.
Click the Update
button. This sets the status of the trade documents in the Project Components
section of the Project Detail page to Complete.
Click the Add
Files button. The Add File dialog box opens. Depending on your
internet settings, you may need to click this button twice. Once to activate
the button and again to open the Add File dialog box.
Locate the file you want to upload. Click on the file
to select it. You can add multiple files by holding down the Ctrl
button while selecting the files.
Click the Add
button on the dialog box. The file name for each file you selected appears
on the Upload pop-up window.
To remove a file from the Upload pop-up window, click
once on the File Name, and click
the Remove Files button. The file
name disappears from the pop-up window. You can remove multiple files
by holding down the Ctrl button
while selecting the files.
Click the Upload
button at the bottom of the pop-up window to upload all the files listed
in the pop-up window. When the upload is complete, you will see a pop-up
window that says, ”Transfer Completed.” The estimated time it will take
to upload all the files is listed above the Upload button.
Click OK on
the Transfer Completed pop-up window. The Upload Project Trade Documents
- Step 2 pop-up window opens, listing all of the files that were uploaded.
For each file, enter a Description/Name
and Version Number, which will
appear on the Project Trade Documents page.
Click the Project Specific?
check box to uncheck the box and add this trade document to the Master
Project list. Or, leave the check mark to mark this trade document as
project specific.
Click the Update and
Close button to complete the upload. The newly uploaded documents
will appear on the Project Trade Documents page under the Included Trade
Documents.
Cost Code -
The cost code to which the trade document is associated.
Description Name
- The Description Name is the name of that will be displayed to bid manager
and bidders on the Trade Document lists for projects in both BuildPro
and SupplyPro. Clicking on the Description Name will allow the user to
view the document.
Version - shows
the version of the trade document.
Size - is the
size of the document in kilobytes (KB).
Edit (included
list only) - Clicking on the Edit link opens a popup window for
the user to edit the information about the trade document.
Replace (included list only) - Clicking on
the Replace link opens a popup window for the user to replace the current
version of the trade document.
History (included list only) - Clicking on
the History link opens a popup window for the user to view the history
of the trade document.
Include/Exclude
- Placing a check mark in the check box in the Include/Exclude column
for a document and then clicking on the Update button will cause the document
to be moved to the other list. (see the Actions section). These columns